Delaware Logistics

Delaware Logistics

Delaware Logistics The Delaware Logistics Park is a multi-phase shipping and logistics park located in New Castle, Delaware. The 134-acre site is home to three buildings that total 1.75 million SF. Corrado Construction was responsible for the sitework package, including grading, utilities, curb and paving. Key Challenges The project had Continue reading

Duck Creek Business Park

Duck Creek Business Park

  Project Overview Over 200 acres of farm fields are being developed for industrial, medical, and office buildings in Smyrna, Delaware. Corrado Construction is working on Phase I out of three phases. The site is adjacent to Duck Creek so meticulous care will be taken to preserve the integrity of Continue reading

Astra Zeneca Parking Garage

Astra Zeneca Parking Garage

  Astra Zeneca This project involved upgrading the parking capacity at Astra Zeneca’s Wilmington campus with a seven-story garage. Access to the adjacent loading dock had to be maintained and the impact to surrounding tenants had to be minimized. Key Challenges Corrado worked in conjunction with the design and construction Continue reading

University of DE – South Green

University of DE – South Green

  UD South Green The South Green project was a large underground steam/condensate and chilled water project for the University of Delaware. This was a fast-paced project through the heart of campus, requiring every move to be carefully thought out and meticulously planned in order to minimize the disruption to Continue reading

Terumo Parking Lot

Terumo Parking Lot

  Terumo Parking Lot Expansion The Terumo Parking Lot project is an additional 390,000 SF parking lot built for Terumo Medical Corporation in Elkton, Maryland. The original site was an undeveloped farmer’s field that required clearing of wooded areas. In addition to the site development package, this project included the Continue reading

Hyatt Place Hotel

Hyatt Place Hotel

  Project Overview This six-story hotel and banquet center along the Christina River in Wilmington began as a four-acre Brownfield site that needed remediation. In addition to the site development package, this project included a StormTech system with liner to collect and store rainwater and discharge during low tide. 3,500 Continue reading

H.O. Brittingham Elementary

H.O. Brittingham Elementary

  Project Overview Corrado performed the site work to prepare roughly 25 acres for the construction of a new elementary school. The existing school stayed active while we prepared the athletic fields for a new building. Fencing was installed to contain the work area and maintain the safety of the Continue reading

Lighthouse Cove

Lighthouse Cove

  Lighthouse Cove Corrado Construction imported and distributed approximately 10,000 cubic yards of sand to restore the shoreline to property boundaries mapped in the 1980s. New storm drainage and outfall were installed in the bay. This was an exciting project to work on; the transformation of the shoreline from beginning Continue reading

Maris Grove

Maris Grove

  Project Overview This five acre project, the final phase of an 87 acre assisted living community, called for the sitework and deep excavation of a basement and underground parking garage. The excavation required shoring work with a combination lagging and tie back system. Earthwork: 21,000 CY Sanitary sewer: 400 Continue reading

Harborchase Assisted Living

Harborchase Assisted Living

  Project Overview Site work and new construction of a 100,316 SF, 120-bed assisted living facility in New Castle, Delaware. The site was a Brownsfield site, where demolition, removal and disposal of existing buildings, sheds, and brush were required before new construction could begin. Corrado Construction’s work on the site Continue reading