Delaware Logistics

Delaware Logistics

Delaware Logistics The Delaware Logistics Park is a multi-phase shipping and logistics park located in New Castle, Delaware. The 134-acre site is home to three buildings that total 1.75 million SF. Corrado Construction was responsible for the sitework package, including grading, utilities, curb and paving. Key Challenges The project had Continue reading

Duck Creek Business Park

Duck Creek Business Park

  Project Overview Over 200 acres of farm fields are being developed for industrial, medical, and office buildings in Smyrna, Delaware. Corrado Construction is working on Phase I out of three phases. The site is adjacent to Duck Creek so meticulous care will be taken to preserve the integrity of Continue reading

Astra Zeneca Parking Garage

Astra Zeneca Parking Garage

  Astra Zeneca This project involved upgrading the parking capacity at Astra Zeneca’s Wilmington campus with a seven-story garage. Access to the adjacent loading dock had to be maintained and the impact to surrounding tenants had to be minimized. Key Challenges Corrado worked in conjunction with the design and construction Continue reading

Terumo Parking Lot

Terumo Parking Lot

  Terumo Parking Lot Expansion The Terumo Parking Lot project is an additional 390,000 SF parking lot built for Terumo Medical Corporation in Elkton, Maryland. The original site was an undeveloped farmer’s field that required clearing of wooded areas. In addition to the site development package, this project included the Continue reading

Hyatt Place Hotel

Hyatt Place Hotel

  Project Overview This six-story hotel and banquet center along the Christina River in Wilmington began as a four-acre Brownfield site that needed remediation. In addition to the site development package, this project included a StormTech system with liner to collect and store rainwater and discharge during low tide. 3,500 Continue reading

Lighthouse Cove

Lighthouse Cove

  Lighthouse Cove Corrado Construction imported and distributed approximately 10,000 cubic yards of sand to restore the shoreline to property boundaries mapped in the 1980s. New storm drainage and outfall were installed in the bay. This was an exciting project to work on; the transformation of the shoreline from beginning Continue reading

Retail Center at 5600 Concord Pike

Retail Center at 5600 Concord Pike

  Project Overview The project scope for 5600 Concord Pike, a 2.5 acre retail center, included erosion controls, earthwork, sanitary sewer, storm pipe, water line, underground storm water retention, concrete and asphalt paving. Earthwork: 6,000 CY Storm sewer: 600 LF Sanitary sewer: 700 LF Waterline: 400 LF Sidewalk: 4,000 SF Continue reading

Rockwood Parcel 1A

Rockwood Parcel 1A

  Project Overview  Corrado Construction was responsible for a full sitework package for a proposed 43 building apartment complex on a 21 acre site. Project scope included the following: All topsoil stripping and site cuts to fills including importing fill material for roadways and building pads Installation and maintenance of Continue reading

Rehoboth Beach City Hall

Rehoboth Beach City Hall

  Project Overview The City of Rehoboth hired Corrado for the demolition of the existing city hall and site work activities associated with the new city hall expansion. EDIS served as the owner representative for this project, and Whiting Turner, under a separate contract, provided well point dewatering, support of Continue reading

WSFS Bank at Rocky Run

WSFS Bank at Rocky Run

  Project Overview This two-acre project, which sits on the previous location of Leon’s Garden Center in North Wilmington, included erosion controls, earthwork, sanitary sewer, storm pipe, water line, bio-retention basins, concrete and asphalt paving. The job also required two DelDOT entrances servicing Rt 202 and Rocky Run Parkway. Earthwork: Continue reading