Datwyler Pharmaceutical

Datwyler Pharmaceutical

  Project Overview This design/build project consisted of site work for a new production plant in Middetown, DE. Scope included: Stripping and stockpiling topsoil across the 15 acre site Performing cuts and fills to grade Stripping overburden and importing select fill for structural areas as needed 104k CY of total Continue reading

Chesapeake Utilities Warehouse

Chesapeake Utilities Warehouse

  Project Overview This project consisted of site work for a new 55,727 SF warehouse and office space on a vacant 20 acres in Dover, DE. Project scope included: Earthwork – 50,000 CY total earthwork, including cuts/fills and topsoil Storm drainage – 3,000 LF Water line – 2,000 LF Sanitary Continue reading

Warwick Mushroom Farm

Warwick Mushroom Farm

  Project Overview Site construction for a 120,032 sf Mushroom Building and 21,328 sf future addition, which included clearing, earth moving and grading, storm pipe, sediment traps, upgrades to MDOT infrastructure and paving. Cut/Fills: 57,000 CY Machine Grading: 68,000 SY Undercuts: 8,000 CY Re-establish undercuts: 9,000 CY Storm: 1,000 LF Continue reading

Waste Management – DRPI Cell 6-2A

Waste Management – DRPI Cell 6-2A

  Project Overview Project consisted of installation of new twelve acre landfill cell adjacent to operating cell of existing landfill, including two foot drainage layer of rice gravel.  The cell received a gas collection system below the primary liner due to existing waste in area (gas wells, vertical and horizontal Continue reading

Johnson Controls Distribution Center

Johnson Controls Distribution Center

  Project Overview Johnson Controls’ Battery Production and Shipping Facility covered approximately 40 acres of land. The building itself covered approximately 10 acres of the property.  Corrado Construction was responsible for the site work, utilities, curbing and paving. Imported nearly 75,000 CY of fill materials, the majority of which was Continue reading

Waste Management – DRPI Cell 6-2

Waste Management – DRPI Cell 6-2

  Project Overview Preparatory grading for future twenty acre landfill cell and installation of large groundwater diversion trench under area of future cell.  The new landfill cell was scheduled to be opened in 2013 and this preparatory work had a tight schedule for completion prior to March 2013. Landfill subgrade Continue reading