  Project Overview This five acre project, the final phase of an 87 acre assisted living community, called for the sitework and deep excavation of a basement and underground parking garage. The excavation required shoring work with a combination lagging and tie back system. Earthwork: 21,000 CY Sanitary sewer: 400 Continue reading

Harborchase Assisted Living

Harborchase Assisted Living

  Project Overview Site work and new construction of a 100,316 SF, 120-bed assisted living facility in New Castle, Delaware. The site was a Brownsfield site, where demolition, removal and disposal of existing buildings, sheds, and brush were required before new construction could begin. Corrado Construction’s work on the site Continue reading

Blue Hen Apartments

Blue Hen Apartments

  Project Overview Full sitework package for a nine-acre site split into multiple phases, including demo, erosion/sediment control, earthwork, site utilities, stormtech systems, curb, stone, hotmix paving, signage and striping. This project involved removing a portion of the existing Blue Hen Mall parking lot – with the majority of the Continue reading

Rockwood Parcel 1A

Rockwood Parcel 1A

  Project Overview  Corrado Construction was responsible for a full sitework package for a proposed 43 building apartment complex on a 21 acre site. Project scope included the following: All topsoil stripping and site cuts to fills including importing fill material for roadways and building pads Installation and maintenance of Continue reading

Robinson Preserve Phases 2&3

Robinson Preserve Phases 2&3

  Project Overview Full sitework package for a multi-phase residential development consisting of 60 lots in two phases. Project scope includes the following: 27 acre existing farm field; all topsoil stripping and site cuts to fills for roadways and lots. Installation of new DelDOT entrance with turn lanes, bike path, Continue reading

Alder Creek

Alder Creek

  Project Overview Alder Creek now sits on a six-acre site that formerly was home to Cleveland Heights, a housing project built in 1967 on a shuttered city landfill and vacant since 2008. Because the soil was deemed contaminated by DNREC, the site needed environmental remediation. The scope of work Continue reading

The Retreat at Newark

The Retreat at Newark

  Project Overview Provided site work for new student housing on University of Delaware campus. Cut/Fill 24,000 CY Cut/Haul 11,500 CY Import 10,000 CY Machine Grading 54,000 SY Sanitary Sewer 3,200 LF Storm Sewer 5,100 LF Roof Drains 1,000 LF 3 Storm Techs 3,000 CY excavated for 3 Bio Ponds Continue reading