Industrial
Project | Warwick Mushroom Farm |
Client | Warwick Mushroom Farms, LLC. |
Design Professional | McCrone Engineering |
Location | Warwick, MD |
Job Size | 1 – 3 Million |
Duration | 1 year |
Date of Completion | July 2016 |
Project Overview
Site construction for a 120,032 sf Mushroom Building and 21,328 sf future addition, which included clearing, earth moving and grading, storm pipe, sediment traps, upgrades to MDOT infrastructure and paving.
- Cut/Fills: 57,000 CY
- Machine Grading: 68,000 SY
- Undercuts: 8,000 CY
- Re-establish undercuts: 9,000 CY
- Storm: 1,000 LF
- Stone: 10,000 Tons
- Asphalt: 4,000 Tons
Key Challenges
Due to existing wet subgrade soils, Corrado worked closely with Geo-Tech to improve the stability of the building pad and drive areas. This consisted of scarifying and drying the wet soils along with undercutting unstable areas and replacing with dry structural compacted fill that was mined onsite.