Residential
![](https://corradoconstruction.com/wp-content/uploads/harborchase_DJI_0716-1024x768.jpg)
Project | Harborchase Assisted Living |
Client | C. D. Smith Construction |
Design Professional | Karins & Associates |
Location | Wilmington, DE |
Job Size | 1 – 3 Million |
Duration | 1 year |
Date of Completion | January 2019 |
Project Overview
Site work and new construction of a 100,316 SF, 120-bed assisted living facility in New Castle, Delaware. The site was a Brownsfield site, where demolition, removal and disposal of existing buildings, sheds, and brush were required before new construction could begin. Corrado Construction’s work on the site included:
- Topsoil stripped: 6,325 CY
- Cuts to fills: 11,000 CY
- Storm sewer: 1,070 LF
- Sanitary sewer: 500 LF
- Waterline: 1,500 LF
- Sidewalk: 21,000 SF
- Curb: 3,500 LF
- Paving: 1,500 tons
- Excavate and install three Bio-retention ponds
- Installation of a 1000′ long retaining wall, 26 catch basins and 2 wet taps
- Asphalt walking trail
Key Challenges
Due to the existing wet subgrade soils, Corrado had to treat approximately 140,290 SF of existing soils with Calciment. As a Brownfield site, removal of buried trash was needed.
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_Capture-1024x577.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_0_927651_2017-03-18-12-11-25-593-1024x576.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_IMG_20170719_142334925_HDR-1024x577.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_IMG_20170719_131755737_HDR-1024x577.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_IMG_20180816_190628981_BURST001-1024x576.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_IMG_20180803_085320234_HDR-1024x577.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_IMG_20180614_122826723-1024x577.jpg)
![](https://corradoconstruction.com/wp-content/uploads/Harbor-Chase_DJI_0912-1024x576.jpg)