Commercial
Project | 5600 Concord Pike Retail Center |
Client | DSM Construction |
Design Professional | Duffield Associates |
Location | Wilmington, DE |
Job Size | 1 – 3 Million |
Duration | 1 year |
Date of Completion | September 2018 |
Project Overview
The project scope for 5600 Concord Pike, a 2.5 acre retail center, included erosion controls, earthwork, sanitary sewer, storm pipe, water line, underground stormwater retention, concrete and asphalt paving.
- Earthwork: 6,000 CY
- Storm sewer: 600 LF
- Sanitary sewer: 700 LF
- Waterline: 400 LF
- Sidewalk: 4,000 SF
- Curb: 3,000 LF
- Paving: 1,800 tons
Key Challenges
This site is in close proximity to Rt 202. It’s also elevated above the busy highway. Corrado Construction was diligent in keeping sediment contained by using a berm and sediment traps. In addition, CCC worked with the project team to make grading adjustments to avoid contact with an existing utility line.