Project | St. Phillips Lutheran Church |
Client | Nason Construction, Inc. |
Design Professional | |
Location | Wilmington, DE |
Job Size | Under 1 Million |
Duration | 1 year |
Date of Completion | August 2016 |
Project Overview
The St. Phillips Lutheran Church project entailed site construction for a new 16,000 sf church. The site package included clearing and grubbing of a wooded lot, utilities installation, the creation of two SWM ponds, upgrades to DelDOT’s infrastructure, paving, and installation of curbs and sidewalks. Scope of work included:
- Clearing and Grubbing: 15,000 SY
- Water: 170 LF
- Storm: 716 LF
- Sanitary: 200 LF
- Dirt: 7,000 CY
- Bio Retention Excavation: 1,307 CY
- Concrete Curb: 1,800 LF
- Concrete Sidewalks: 6,053 SF
- Asphalt: 1,133 Tons
Key Challenges
Corrado worked closely with Nason Construction, CDA Engineering, Delmarva Power, and DelDOT to identify potential issues and resolve them before work was in progress.